Answer: <em>True.</em>
Explanation:
The statement given is true, since scheduling takes place before sequencing. Here, scheduling refers to the process of controlling, arranging, and optimizing workloads and work under a production process. Organization uses forward and backward scheduling in order to allocate machinery resources, plant and human resources, purchase materials and plan production . On the other hand, sequencing refers to evaluation of priority required for job processing.
<u>Answer:</u>
The hazards considered to be the greatest risk is caught in or-between hazards.
<u>Explanation:</u>
- In ‘caught in or-between’ hazards, important body parts are highly vulnerable to the risk of getting cut or completely disabled if proper safety measures are not put to use.
- In most cases of these hazards, the only treatment that can be done after the accident is that of amputation.
- Hence, it is utterly necessary to plan the work well in advance, be highly alert and attentive throughout the process of the work, and implement all the safety measures required.
Wouldn’t it be defense? I would put defense because it would technically have too be correct. If you get another answer I would go with that. So ya
The answer would be "A. Increasing funding for local grants." I remember this from my quiz in economics from last year, and I hope this helps you. :)
Answer:
ITS A
Explanation:
sorry had caps on but its a i got it wrong then saw the right answer big iq