1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
VikaD [51]
3 years ago
10

A strictly dominates choice B in a multi-attribute utility. It is in your best interest to choose A no matter which attribute yo

uare optimizing.
a. True
b. False
Computers and Technology
1 answer:
Elden [556K]3 years ago
8 0

Answer:

A strictly dominates choice B in a multi-attribute utility. It is in your best interest to choose A no matter which attribute youare optimizing.

a. True

Explanation:

Yes.  It is in the best interest to choose option A which dominates choice B.  A Multiple Attribute Utility involves evaluating the values of alternatives in order to make preference decisions over the available alternatives.  Multiple Attribute Utility decisions are basically characterized by multiple and conflicting attributes.  To solve the decision problem, weights are assigned to each attribute.  These weights are then used to determine the option that should be prioritized.

You might be interested in
You have just performed a cpm analysis and have found that more than one path through the project network has zero slack values.
Alex787 [66]

Answer:

There are multiple critical paths

Explanation:

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

The essential technique for using CPM is to construct a model of the project that includes the following:

  •    A list of all activities required to complete the project (typically categorized within a work breakdown structure),
  •    The time (duration) that each activity will take to complete,
  •    The dependencies between the activities and,
  •    Logical end points such as milestones or deliverable items.      

Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.

5 0
3 years ago
If the value of score1 is 350 and the value of score2 is 210, what will be the value of result after the code segment is execute
MAVERICK [17]

  The value of result of the  code segment is executed is known to be 4.

<h3>Why is the value of the code segment so?</h3>

  When the result of  is not  executed because the condition is said to be false and also when there is a false condition is, the else statement will be said to be true

  Therefore,   result = result + 2; -> result is brought up by 2 to bring about 4 and as such, the value of result of the  code segment is executed is known to be 4.

Learn more about scores from

brainly.com/question/19492935

#SJ1

4 0
2 years ago
Arrange the types of movies in terms of the amount of content they can hold
posledela

Answer:

Well here is what I got...

Explanation:

Action

Crime

Fantasy

Horror

Romance

Science Fiction

Slice of Life

Sports

Thriller

War

Western

8 0
3 years ago
Sandie is writing a report for her environmental science class. She has asked her older sister who is away at college to proof h
vichka [17]
Help each other because if the other sister is older she should have more experience and knowledge

8 0
3 years ago
Read 2 more answers
The __________ certification program has added a number of concentrations that can demonstrate advanced knowledge beyond the bas
Sophie [7]

Answer:

CISSP

Explanation:

The CIDDP concentrations are an extension and development on the knowledge and credentials of the standard CISS certification that improves employability and career advancement

The CISSP concentrations includes

Information System Security Architecture Professional which can be known as ISSAP

Information System Security Engineering Professional which can be known as ISSEP

Information System Security Management Professional which can be known as ISSMP.

4 0
3 years ago
Other questions:
  • A client has macular degeneration resulting in moderate visual impairment. The client works as a data entry clerk and wants to c
    15·1 answer
  • Bob's Assembly is a hardware manufacturer. It specializes in builders' hardware for doors, cabinets, windows, and bathrooms. Bob
    10·1 answer
  • Green field county stadium is planning to conduct a circket match between two teams A and B. A large crowd is expected in the st
    13·1 answer
  • In this website/app what are the points for?
    7·1 answer
  • What is an internal node?
    11·1 answer
  • Explain how touch-tone dialing sends digits to the switch and write the name given to define touch-tone dialing.
    10·1 answer
  • Which feature is used to summarize data from multiple worksheets but does not require that the data be in the same location on e
    12·1 answer
  • write a c++ program that takes a string input from the user and removes all characters except numerals also display the number o
    11·1 answer
  • The security administrator for Corp.com wants to provide wireless access for employees as well as guests. Multiple wireless acce
    11·1 answer
  • Why hackers hack?? in other people?​
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!