A manufacturing machine has two processes. One of them is repeated 4 times and the second only once. The entire cycle can take n
o longer than 3 minutes. Which graph represents the overall equation represented by this scenario (all points may not apply to the scenario)? On a coordinate plane, a dashed straight line has a negative slope and goes through (0, 3) and (1, negative 1). Everything to the right of the line is shaded.
On a coordinate plane, a dashed straight line has a negative slope and goes through (0, 3) and (1, negative 1). Everything to the left of the line is shaded.
On a coordinate plane, a solid straight line has a negative slope and goes through (0, 3) and (1, negative 1). Everything to the right of the line is shaded.
On a coordinate plane, a solid straight line has a negative slope and goes through (0, 3) and (1, negative 1). Everything to the left of the line is shaded.
Mark this and return