Now the first mechanic takes 4 days to do the job, so after he has worked for 1 day only, he has done 1/4 of the whole thing.
the second mechanic can do it in 6 days, so after 1 day only of work, he has done 1/6 of the whole thing.
the third mechanic can do it in 8 days, so after a day, he has done 1/8 of the total work.
now, if they all three work together, after 1 hour has gone by, the first mechanic has done 1/4 of the whole thing, the second mechanic has done 1/6 of it, and the last one, has done 1/8.
let's say it took all three working together "t" days, that means after 1 hour of work, they all combined have done 1/t of the whole thing, thus
1+1= 2
Big brain >:3 Ty for the points tho ^^
Answer: $27.50
Explanation:
4 students + 8 friends = 12 people altogether
$330.60/12 = $27.50
Therefore, it’s going to cost approximately $27.50 per person.
For question 4, 
Question 5. Option a and question 6. Option j
Step-by-step explanation:
Step 1:
The three basic formula needed to solve these questions are:

Step 2:
Using the above formula, we solve the following values









Step 3:
For question 5, The triangle's angle = 23°, opposite side = BC inches and hypotenuse = 4 inches.

SO BC is 1.5628 inches, rounding this off to the nearest tenth, we get BC = 1.6 inches which is option a.
Step 4:
For question 6, The triangle's angle = 50°, opposite side = QR m the adjacent side = 8.1 m.

SO QR is 9.65277 meters, rounding this off to the nearest tenth, we get QR = 9.7 inches which is option j.
The question is an illustration of probability, and the value of P(B|C) is P(B|C) = 9/24 =0.38
<h3>How to determine the probability P(B|C)?</h3>
The table is given as:
C D Total
A 15 21 36
B 9 25 34
Total 24 46 70
The probability (BIC) is calculated using:
P(B|C) = n(B and C)/n(C)
From the table, we have:
n(B and C) = 9
n(C) = 24
So, the equation becomes
P(B|C) = 9/24
Evaluate
P(B|C) = 0.38
Hence, the value of P(B|C) is P(B|C) = 9/24 =0.38
Read more about probability at:
brainly.com/question/251701
#SPJ1