Answer: 40 minutes
Step-by-step explanation:
It takes 16 minutes for the first 2 stations to water their sections which means that the time taken per station is:
= 16/2
= 8 minutes per station
Ms. Reynolds has 5 stations.
Total time taken will therefore be:
= 8 * 5
= 40 minutes
Answer:
Option D
Step-by-step explanation:
A). From the graph attached,
Arrow AB represents the RISE and arrow BC represents the RUN.
B). RUN from point A to B (Horizontal distance) = 2 units
Rise from point A to B (Vertical distance) = -4 [Since, downwards arrow represents negative notation]
Slope of the line segment AB = 
= 
= -2
Therefore, slope of the line = slope of the line segment AB = -2
Option D will be the correct option.
The answer to your question is yes
<span><span><span><span>3/4</span>x</span>+11 </span>< <span><span>0.3x</span>+<span>3/4
</span></span></span>First turn 3/4 from both sides to decimals to get..
.75x+11 < 0.3x+.75
And then subtract 0.3x from both sides to get
.45x+11 < .75
And then subtract 11 from both sides to get
.45x < -10.25
And then divide both sides by .45x to get
x < -22.77777778
To do this you must combine like terms as follows.
7x + 6x = 13x
7 - 9 = -2
Combine these together and you will get the following.
13 - 2 or -2 +13