If you are evaluating the answer is -41
Answer:
No.
Step-by-step explanation:
9 Does not go into 47 or 23
Answer:
216 cookies
Step-by-step explanation:
From the question,
Let the total cookies in the first place be x cookies.
Their ratio = 5:12:9
Total = 5+12+9 = 26.
Weiming share = (5/26)x = 5x/26
If weiming sold 28 cookies
⇒ (5x/26)-28
⇒ (5x-728)/28
Hence Weiming new share = (5x-728)/28 cookies
The new ratio is 1:8:6
The total cookies becomes = x-28
Therefore,
(1/15)(x-28) = (5x-728)/28
(x-28)/15 = (5x-728)/28
Crossmultiply
28(x-28) = 15(5x-728)
28x-784 = 75x-10920
Collect like terms
28x-75x = -10920+784
-47x = -10136
x = -10136/-47
x = 215.7
x ≈ 216 cookies
Answer:
<h2>
perimeter of △SMP = 25</h2>
Step-by-step explanation:
The perimeter of the triangle △SMP is the sum of al the sides of the triangle.
Perimeter of △SMP = ||MS|| + ||MP|| + ||SP||
Note that the triangle △LRN, △LSM, △MPN and △SRP are all scalene triangles showing that their sides are different.
Given LM=9, NR=16 and SR=8
NR = NP+PR
Since NP = PR
NR = NP+NP
NR =2NP
NP = NR/2 = 16/2
NP = 8
From △LSM, NP = PR = <u>MS</u><u> = 8</u>
Also since LM = MN, MN = 9
From △SRP, SR = RP = <u>PS = 9</u>
Also SR =<u> MP = 8</u>
From the equation above, perimeter of △SMP = ||MS|| + ||MP|| + ||SP||
perimeter of △SMP = 8+8+9
perimeter of △SMP = 25
A, B and C working together will finish same piece of work in 10 days
A can do a piece of work in 20 days. That is A is doing the work at a rate of 1 / 20. Therefore
B = 1 / 30
C = 1 / 60
A, B and C working togehter their rate will be added together =
A + B + C = 1 / 20 + 1 / 30 + 1 / 60 = 1 / 10
so they can work together to finish same piece of work in 10 days