The last number would be 86 , TRUST ME I know these stuff!!
Answer:
(-9,12)
Step-by-step explanation:

The distance is 54 km if the speed and time are 72 km/h and 45 minutes respectively.
<h3>What is distance?</h3>
Distance is a numerical representation of the distance between two items or locations. Distance refers to a physical length or an approximation based on other physics or common usage considerations.
We have:
Speed = 72 km/h
time = 45 mins = 45/60 = 0.75 hours
We know,
Distance = Speed×time
Distance = 72(km/h)×0.75(h)
Distance = 54 km
Thus, the distance is 54 km if the speed and time are 72 km/h and 45 minutes respectively.
Learn more about the distance here:
brainly.com/question/26711747
#SPJ1
Answer:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
According to the situation the calculation is shown below:-
= 
= 240 sq ft each member of the team in 36 minutes
= 
= 6.67 sq ft each member of the team within 1 minute

= 60 sq ft for every 9 team members in one minute
= 
= 70 minutes (or 1 hour and 10 minutes)
Hence, the 70 minutes is taken for 9 team members
Answer:
It is a negative correlation
Step-by-step explanation:
As the x value increases the y value decreases. This causes it to be a negative.