The answer is c
Because if it takes 50 minutes to run 4 miles you need to divide 50/4 and you will get 12.5 and then multiply that by 30 cause she is trying to run 30 miles and that will get you 375 and then divide that by 60 cause their are 60 minutes in a hour and you will get 6.25
Answer:
I think the distance is 7
To find decimal, divide 13/50= 0.26
To find percent divide decimal above by 100 (or move decimal place to the right two places).
0.26/100= 26%
Hope this helps! :)
Answer:
The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.
Step-by-step explanation: