Hey, I’m pretty sure the answer is y=1/2x + 0.
To explain, we can plug the x value into the equation for all of the x values, and we will get our y value.
So the first one,
y=1/2(1) + 0 —> 1/2
The second one,
y=1/2(2) + 0 —> 1
And so forth, the rest of the equations will be correct. I hope that helps ! :D
Answer:
48 minutes
Step-by-step explanation:
Given that:
Time taken by Janet = 3 hours
Janet's rate = 1/3 job / hour
Time taken by Garry = 2 hours
Garry's rate = 1/2
Rate of working together :
1/3 + 1/2 = (2 + 3) /6 = 5/6 job/hour
If Janet works for one hour before Garry joins ;
1/3 of the job has been done by Janet
1 - 1/3 = 2/3 of the job left
Hence to finish the job together, it will take :
Fraction of JOB left ÷ rate of working together
(2/3 ÷ 5/6)
= 2 /3 * 6/5
= 12 / 15
= 4 / 5 hours
To minutes
(4/5) * 60
= 240/5
= 48 minutes
Hello.
Taking a look at our screenshot provided, we can conclude that we need to find the missing angle degree out of 90 degrees, as we are dealing with a right angle.
Let's set this up as an Algebraic formula and solve for the variable;
5x + 15 + 50 = 90
First, let's combine like-terms (15 and 50).
5x + 65 = 90
Now, isolate our variable by subtracting 65 from each side of the equation.
90 - 65 = 25
65 - 65 = 0
5x = 25
Now, divide both sides by 5 to solve for x, our missing angle degree.
x = 5
Your answer is A.) 5
I hope this helps!
Answer:
20 degrees C
Step-by-step explanation:
You would substitute the F with 68 since it is 68 degrees F. Then you would solve the equation. (Subtract 32 from 68=36; multiply 36 by 5/9=20)