Answer:
0.942 is the required probability.
Step-by-step explanation:
We are given the following in the question:
x is a binomial random variable with n = 5 and p = 0.8.
Then,
where n is the total number of observations, x is the number of success, p is the probability of success.
We have to evaluate:

0.942 is the required probability.
Answer:
$18,630
Step-by-step explanation:
The cost of every college is expected to increase 3.5% next year.
The cost to attend Westish College is currently $18000.
What is the expected cost to attend Westish College next year?
The increase in the cost for next year is calculated as:
3.5 % × Current cost
= 3.5% × $18,000
= $630.
The expected cost to attend Westish college next year=
$18,000 + $630
= $18,630
Angle RQN and angle RQS, because they will add up to 180 degrees
Let 2x – y = 3 ——— equation 1
Let x + 5y = 14 ——— equation 2
Making x the subject in eqn 1, = x = y + 3 / 2 ——— eqn 3
• Put eqn 3 in eqn 2
(y + 3 / 2) + 5y = 14
6y = 14 – 3/2
6y = 25/2
y = 25/12
• put y = 25/12 in eqn 3
x = (25/12 + 3/2)
x = 43/12