Answer:
not sure
Step-by-step explanation:
Answer:
If 2/3 ton of gravel covers 3/4 of a driveway, you need to divide 2/3 divided by 3 to find how much is needed for 1/4 of the driveway. So first step:
1. 2/3 divided by 3 = 2/3 * 1/3. So 2/9.
2. Add 2/3 plus 2/9= 8/9 ton of gravel to cover the whole driveway.
Step-by-step explanation:
Mark me brainliest!
Answer:
d = 5,35 ft
Step-by-step explanation: See annex
Figure in annex is clear,
sin ∠42⁰ = d / 8
And
sin ∠42⁰ = 0.669
d/8 = 0,669
d = 0,669*8
d = 5,35 ft
k=73. All the angles in any triangle must add up to 180.