Answer:
Step-by-step explanation:
Assuming each person gets the same amount of work done, each wall in the first scenario takes 8 minutes to paint. If 3 people paint 4 walls, then each person is painting 1 1/3 of a wall. We can use that to find out how long it takes one person to paint 1 1/3 walls:
. Interpreting that, it takes each person 10 2/3 minutes to paint 1 1/3 walls.
If 4 people paint 7 walls, that means that each person is painting 7/4 walls, or 1.75 walls each. Using the fact that it takes 10.66666 minutes to paint 1.33333 walls, we can find out how many minutes it will take to paint 1.75 walls:
Cross multiply to get
18.666655 = 1.3333x so
x = 14.000 minutes
Answer:
<h2>
23 cars</h2>
Step-by-step explanation:
total number of cars: x
the total number of axles: 46
and the number of axles installed per car: 2
2 axles in each car, then total instaled axles: 2•x
2•x = 46
x = 46÷2
x = 23
for the y value you would go up the top line by 2 in problem 3 for the x value you would go to the left by 4 and follow the same steps but with different numbers for problem 4
Have a great day
Hope that helps :)
Answer:
Step-by-step explanation:
48 is preimeter
96 is the area
Make me brainliest
Answer:
B. 2x + 4y
Step-by-step explanation:
If x = 4, and y = 7, let's substitute these values for x and y in the equations!
For A, the equation is 2xy. Substitute the values and you have 2(4)(7) which equals 56. This expression is incorrect since the expression doesn't equal 36.
For B, the equation is 2x + 4y. Substitute and you get the equation
2(4) + 4(7) → 8 + 28 = 36.
36 is your desired value, and you get that with the expression 2x + 4y.