Please help and show work!

Mathematics
1 answer:
Lilit [14]2 years ago
3 0

Answer:

Step-by-step explanation:

The given quadratic must be rewritten in standard form before anything else is done:  -2x^2 + 8x - 8 = 0.  The coefficients of the x terms are {-2, 8, -8}.

The discriminant b^2 - 4ac is therefore (8)^2 - 4(-2)(-8), or  64 -  64, or 0.

A zero discriminant points to two real, equal solutions.

You might be interested in
Just answer 3 and 4 you don’t need to show your work just answers please!
ad-work [718]
#3.) 48 pieces of ribbon
#3.) this week they cost $112
8 0
3 years ago
9.48 as a mixed number in simplist form
mafiozo [28]

Answer:

<h2>9 12/25.</h2>

Step-by-step explanation:

9.48 as a mixed number in simplest form:

<em><u>948/100</u></em>

<em><u>948/100= 948 ÷ 4/100 ÷ 4</u></em>

<em><u>948/100= 948 ÷ 4/100 ÷ 4= 237/25</u></em>

<em><u>948/100= 948 ÷ 4/100 ÷ 4= 237/25= 9 12/25</u></em>

<u>9 12/25 is the mixed number.</u>

8 0
3 years ago
In 1995 a gallon of gas used to cost $1.00 today a gallon of gas cost $4.00 what is the percent increase?
Wittaler [7]

Answer:

300%

Step-by-step

300% of 1.00$ is 4.00 because you are adding 1.00 + 300%

5 0
2 years ago
Read 2 more answers
A small business makes 3-speed and 10-speed bicycles at two different factories. Factory A produces 16 3-speed and 20 10-speed b
GarryVolchara [31]

Answer:

Factory A should be operated 6.11 days

Factory B should be operated 6.88 days

The minimum cost for factory A is $6,110

The minimum cost for factory B is $5,504

Step-by-step explanation:

Factory A

Daily production: 16 3-speed and 20 10-speed bikes

Total daily production = 16+20 = 36 speed bikes

Order: 80 3-speed and 140 10-speed bikes

Total order = 80+140 = 220 speed bikes

Number of days = 220/36 = 6.11 days

Cost per day = $1,000

Minimum cost for 6.11 days = $1000 × 6.11 = $6,110

Factory B

Daily production: 12 3-speed and 20 10-speed bikes

Total daily production = 12+20 = 32 speed bikes

Total order = 220 speed bikes

Number of days = 220/36 = 6.88 days

Cost per day = $800

Cost for 6.88 days = $800 × 6.88 = $5,504

6 0
3 years ago
An elevator has a maximum weight of 300 pounds. Each pallet of boxes weighs 25 pounds. Which of the following number lines best
iren2701 [21]

Answer: C.

Step-by-step explanation:

1. Go

2.Stop

3. Win

Sorry if you didn't understand, we do math here differently in Albania ^^

yes

4 0
2 years ago
Other questions:
  • What is the area of the backyard without the garden?
    8·1 answer
  • What kind of fraction 22/13
    13·1 answer
  • The product of two numbers is 20. If one the numbers is 5/12 what is the other number
    14·1 answer
  • Please help and show work!!
    11·1 answer
  • Six tools are in a bag – a hammer, wrench, drill, pliers, screwdriver, and measuring tape. You are trying to find the probabilit
    6·2 answers
  • A middle school yearbook committee has 35 members. There are 7 more girls than boys. Write a system of linear equations, define
    9·1 answer
  • To be considered as a menu item for Gloria's new restaurant an item must have scored in the top 15% by the food critics in the a
    6·1 answer
  • Simplify 18 over 3 over 4
    13·1 answer
  • What is the quotient of 33,075 divided by<br> 35?
    14·2 answers
  • If line PQ and line RS are different names for the same line, what must be true about points P, Q, R, and S?
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!