Answer: £ 81.38
Step-by-step explanation:
Given: On Monday,
5 builders took
hours ( i.e.
hours ) to build a wall.
On Tuesday, only 2 builders were available.
As workers are inversely proportional to the time if the job remains constant.
Inverse variation equation : 
Let x be the time taken by 2 builders, then


So, 2 builders will take 8.75 hours.
Each paid £9.30 for each hour.
Then, each builder will be paid for the work completed on Tuesday = £9.30 x 8.75
≈ £ 81.38
Hence, each builder will be paid £ 81.38 for the work completed on Tuesday .
The model (x+a)(x-a) will represents the factors of 4x²-9 as (2x+3)(2x-3).
<h3>What are the quadratic equations in one variable completing the squares method?</h3>
The "completing the squares" method aims to construct a quadratic equation of the form where the x variable is entirely covered by a single squared term, which is the square of a linear expression in x, as the name suggests.
The quadratic equation can resemble this:
x²-a² = (x+a)(x-a)
Given equation;
⇒4x²-9
⇒(2x)²-3²
The equation can be modeled as;
(2x+3)(2x-3)
Hence the model (x+a)(x-b) will represents the factors of 4x²-9 as (2x+3)(2x-3).
To learn more about completing the squares method refer to:
brainly.com/question/16800259
#SPJ1
Answer:
79.6 dollars saved
Step-by-step explanation:
Mail
4 times 54.90 equals 219.6
4 times 6.50 equals 26
4 times 8.34 equals 33.36
219.6 + 26 + 33.36 = 278.96
Local store
332 times .08 equals 26.56
332 + 26.56 = 358.56
Difference
358.56 - 278.96 = 79.6
Answer:
Rate of change = 3
Step-by-step explanation:
The rate of change is the slope.
Slope = 3
Answer:
35 bagels
Step-by-step explanation:
Duh