Information to develop a project network is collected from the work breakdown structure
<h3>
Work breakdown structure </h3>
Work breakdown structure (WBS) is a structure showing the steps needed to be taken so as to complete a project.
WBS is presented in visual format and it is usually arranged based on hierarchy.
Information to develop a project network is collected from the work breakdown structure
Find out more on Work breakdown structure at: brainly.com/question/6197566
Answer:
The output is: Your cost is 100
Explanation:
Given
The above code snippet
and

Required
Determine the output of the code
if cost < 70 or cost > 150
The above condition checks if cost is less than 70 or cost is greater than 150
This condition is false because 100 is neither less than 70 nor is it greater than 150
So, the else statement will be executed.
discount = cost
Which means
discount = 100
So, the print instruction will print: Your cost is 100
Answer:knowing how to build and program computers.
Explanation: