-- It takes 10 workers 3 days to build 1 house.
so
-- It takes 10 workers 1 day to build 1/3 of a house.
so
-- It takes 1 worker 1 day to build 1/30 of a house.
You got 15 workers and you need 4 houses ?
Well, as we just calculated . . .
-- It takes 1 worker 1 day to build 1/30 of a house.
so
-- It takes 15 workers 1 day to build 15/30 = 1/2 of a house.
so
-- It takes 15 workers 2 days to build 1 whole house.
so
-- It takes 15 workers 8 days to build 4 houses.
Answer:
550 pounds
Step-by-step explanation:
If this answer helped you then please consider making this brainliest and thank this response :)
1; (1/4)/(1/4), all you do is flip the fraction to make the reciprocal and multiply, so (4/1)x(1/4)=1
0.5s + 1 = 7 + 4.5s Subtract 4.5s from both sides
-4s + 1 = 7 Subtract 1 from both sides
-4s = 6 Divide both sides by -4
s = -

Simplify
s = -
Answer:
y = 4 sin(½ x) − 3
Step-by-step explanation:
The function is either sine or cosine:
y = A sin(2π/T x) + C
y = A cos(2π/T x) + C
where A is the amplitude, T is the period, and C is the midline.
The midline is the average of the min and max:
C = (1 + -7) / 2
C = -3
The amplitude is half the difference between the min and max:
A = (1 − -7) / 2
A = 4
The maximum is at x = π, and the minimum is at x = 3π. The difference, 2π, is half the period. So T = 4π.
Plugging in, the options are:
y = 4 sin(½ x) − 3
y = 4 cos(½ x) − 3
Since the maximum is at x = π, this must be a sine wave.
y = 4 sin(½ x) − 3