It takes 42 minutes for 6 people to paint 7 walls
<em><u>Solution:</u></em>
It takes 54 minutes for 4 people to paint 6 walls
To find: Minutes required for 6 people to paint 7 walls
If
men can do
work in
days working
hours per day and
men can do
work in
days working
hours per day, then

M = Number of men
D = Number of days
H = Number of hours per day
W = Amount of work
Here in this sum,
<em><u>54 minutes for 4 people to paint 6 walls</u></em>

<em><u>Minutes required for 6 people to paint 7 walls</u></em>

<em><u>Substituting the values in formula, we get</u></em>

Thus it takes 42 minutes for 6 people to paint 7 walls
Using the normal distribution, it is found that the correct option is:
In a <em>normal distribution</em> with mean
and standard deviation
, the z-score of a measure X is given by:
- It measures how many standard deviations the measure is from the mean.
In this problem:
- The mean on the Wechsler Scale is of 100, hence
.
- The standard deviation is of 17, hence
.
- Brianna had an score of 117, hence

Then:



Hence, the option d is correct.
To learn more about the normal distribution, you can check brainly.com/question/24663213
To find the hypotenuse in a 45-45-90 triangle multiply the legs by

So...
The leg is 12 the hypotenuse is 12
The numbers DO differ by 10 if they are
- 1 and 11
- 2 and 12
- 3 and 13
- 4 and 14
- 5 and 15
Each outcome technically has two ways of occurring, but since we're taking two marbles at a time, that would be the same as saying, for instance, that drawing 1 and 11 is the same as drawing 11 and 1. We only count such an event once.
So the answer is (a) 5.
I don't know if anyone know say him answer