Answer:
i think it is 234 i am not sure
Step-by-step explanation:
Answer:2000
Step-by-step explanation:2500x0.2=500
2500-500=2000
graph B shows the correct business equation.
we can represent it as
y = 5 + 2x
as x = 1 , y = 5+2×1=5+2=7
and so on.
Answer:
Total length after 33 days will be 117 miles
Step-by-step explanation:
A construction crew is lengthening a road. The road started with a length of 51 miles.
Average addition of the road is = 2 miles per day
Let the number of days crew has worked are D and length of the road is L, then length of the road can represented by the equation
L = 2D + 51
If the number of days worked by the crew is = 33 days
Then total length of the road will be L = 2×33 + 51
L = 66 + 51
L = 117 miles
Total length of the road after 33 days of the construction will be 117 miles.