Step-by-step explanation:
The equation of the line is x = 4.
Answer:
30 miles
Step-by-step explanation:
average= sum of miles ÷ days to cover = 30
HOPE IT HELPS
You have two unknown rates, so we need to develop two equations to solve for these unknowns (based on the information given on the problem statement):
5x + 10y = 725
x + y = 100
By substitution, we get:
5x + 10(100 - x) = 725
5x + 1000 - 10x = 725
-5x = 725 - 1000
-5x = -275
x = -275/-5 = 55
100 - 55 = 45
Thus:
The mechanic who worked for 5 hours charged his time at $55/hr, and the mechanic who worked for 10 hours charged his time at $45/hr.
To verify, plug and chug the results back into the original equations:
5(55) + 10(45) = 725
275 + 450 = 725
725 = 725 [OK]
55 + 45 = 100 [OK]
The company has to study 199 machines.
In statistics, the standard deviation is a measure of the amount of variation or dispersion of a set of values. A low standard deviation indicates that the values tend to be close to the mean of the set, while a high standard deviation indicates that the values are spread out over a wider range.
It is given that;
Margin of error E = 0.7
Confidence interval 98% = 1-0.98 = 0.02
Standard deviation = 6 hours
Number of MRI machines needed per day n, = [(z alpha/2 * SD)/E]²
Z alpha/2 = 1.645 at alpha = 0.1
Inputting these values into n we have that
[(1.645*6)/0.7]²
= 14.1²
= 198.81 is approximately equal to 199
The company has to study 199 machines.
To know more about standard deviation visit: brainly.com/question/475676
Answer:
x-7>0
Straight answer: x-7
Step-by-step explanation:
Assuming that the timber is X cm long and 7cm was cut off, there remaining amount is x - 7cm. In order for 7cm to be cut off, the timber must have been > 7cm long => x > 7 => x - 7 > 0