Answer:
A=1.5 units²
Step-by-step explanation:
a²+b²=c²
2.5²+1.5²=c²
a²+2.25=6.25
a²=4.00
a=2
A=1/2 x b x h
A=1/2 x 1.5 x 2
A=1.5 units²
Answer:
The ordered pair that corresponds to point P is: (4, 2)
Step-by-step explanation:
It is clear from the graph that the point P is located at the location (4, 2).
In other words,
at x = 4, y = 2
It means:
The x-coordinate of the point P is: x = 4
The y-coordinate of the point P is: y = 2
Thus, the location of the point P → P(x, y) = P(4, 2)
Please check the attached graph.
Therefore, we conclude that:
The ordered pair that corresponds to point P is: (4, 2)
9 is subtracted from the sum of 5 and a number
There is no solution since ln(0) is undefined
Answer:
The 95% confidence interval for the average monthly electricity consumed units is between 47.07 and 733.87
Step-by-step explanation:
We have the standard deviation for the sample. So we use the t-distribution to solve this question.
The first step to solve this problem is finding how many degrees of freedom, we have. This is the sample size subtracted by 1. So
df = 45 - 1 = 44
95% confidence interval
Now, we have to find a value of T, which is found looking at the t table, with 44 degrees of freedom(y-axis) and a confidence level of
. So we have T = 2.0141
The margin of error is:
M = T*s = 2.0141*170.5 = 343.4
In which s is the standard deviation of the sample.
The lower end of the interval is the sample mean subtracted by M. So it is 390.47 - 343.40 = 47.07 units per month
The upper end of the interval is the sample mean added to M. So it is 390.47 + 343.40 = 733.87 units per month
The 95% confidence interval for the average monthly electricity consumed units is between 47.07 and 733.87