Answer:
Not proportional.
Step-by-step explanation:
The values do not begin from a straight line at the origin. X begins at 2, not the origin.
Answer: (60.858, 69.142)
Step-by-step explanation:
The formula to find the confidence interval for mean :
, where
is the sample mean ,
is the population standard deviation , n is the sample size and
is the two-tailed test value for z.
Let x represents the time taken to mail products for all orders received at the office of this company.
As per given , we have
Confidence level : 95%
n= 62
sample mean :
hours
Population standard deviation :
hours
z-value for 93% confidence interval:
[using z-value table]
Now, 93% confidence the mean time taken to mail products for all orders received at the office of this company :-

Thus , 93% confidence the mean time taken to mail products for all orders received at the office of this company : (60.858, 69.142)
Hello!
You divide the total time by the time unit for the slope
54 / 3 = 18
Multiply this by how height the cart goes
4 * 18 = 72
The answer is 72
Hope this helps!
Answer:
<h2>There are 5040 different possible sequences.</h2>
Step-by-step explanation:
Three identical notches and four identical bends are required in the sheet metal operation.
In total 7 things are required in the metal operation.
We can think it as we need to put the 3 notches and 4 bends in 7 places.
First, lets put the 3 notches in 3 places.
In order to do so, we need to choose 3 places from the 7 places.
We can choose 3 places in
ways.
The 3 notches can be arrange in 3! = 6 ways.
The 4 bends can arrange in 4! = 24 ways.
Thus, in total
different possible sequences.