cheatercheatercheatercheatercheatercheatercheatercheatercheatercheatercheatercheater
Answer:
A.
Explanation:
A well designed high-volume system will minimize work-in-process (WIP) inventory and reduce lead time for the product.
Work in process (WIP) are partially finished products. WIP inventory could be minimized by designing a suitable high-volume system.
Lead time or throughput time is the time taken for a product to be manufactured or processed. A well designed high-volume system would reduce throughput time.
<span>another name for what-if analysis (that what is is called "what-if analysis" </span>
Answer:
what is briefly tell me also