Answer:
5 weeks.
Explanation:
The replenishment lead times are 2 weeks for the plant,1 week for the DC ,! week for the regional warehouse and 1 week for the store.
The planning horizon is the amount of time that will be required by an organization when the organization is preparing for a strategic plan.
So the minimum planning horizon is 5 weeks.
The answer is D.)Industrial activity harming the environment. This is, because they are cutting down the trees in Asia/
Maximilien Robespierre, a jacobist, argued for and became a member of Committee of Public Safety.
<h3>What was the Commitee of safety?</h3>
This was a committee that was headed by Robespierre. What the committee did at the time was to encourage the death oof thousands of people by the guillotine in France.
Those that were killed were tagged as the enemies of the revolution. This body was the political body of the French revolution.
The way that it ended was that he was also executed through the same menas in front of a cheering crowd.
Read more on Maximilien robespierre here
brainly.com/question/498933
#SPJ1
Answer:
have a specilaist that speaks any lanuguage
Explanation: