1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
xeze [42]
3 years ago
9

Plzzzzzzzzzzzzzzzzzzzzzzzzzzzzzz

Mathematics
1 answer:
maw [93]3 years ago
8 0

Answer:

1. 4 is the constant

2. x > -2

3. 2.86 inches

^The formula for the circumference of a circle is C=2∏r, in which r=radius. To find the radius, then, we insert 18 in for the circumference. So 18=2∏r. Solving for r gives 9/∏, or approximately 2.86 inches.

hope this helped:)

Brainliest?

You might be interested in
Explain why a triangle can't have two right angles​
Sedbober [7]

Answer: They would be a rectangle.

Step-by-step explanation:

2 right angles need at least 4 sides, making it impossible to have a 3-sided 2 right angle triangle.

8 0
3 years ago
Best estimate of 20% 516
tensa zangetsu [6.8K]
Since it's an estimate, probably 103<span />
8 0
3 years ago
Read 2 more answers
What is the measure of ∠2 if c∥d ?
Ivahew [28]
Since both C & D are parallel, angle 2 is a corresponding angle to the angle of 108 degrees, so angle 2 is also 108 degrees
7 0
3 years ago
In Mr Bunnelo's class, 19 out of 26 students wore their school shirt on Friday. If the school has a
-Dominant- [34]
The answer is 1799 students
4 0
2 years ago
8 men will take 10 days to build a wall 150 metres long. After the men had started working for 6 days, they were told that the w
Mashutka [201]
First, find out how much each man works. If eight men take 10 days to build 150 m of wall, then that means that it takes 80 man days to build 150 m. One Man day is then 150÷80, in other words 1.875. If eight men have already been working for six days, then they have spent 8×6 man days, 48. 48 men days times 1.875 m of wall per man day equals 90 m of wall have been built. So, you have four days left to build the remaining 60 m of wall as well as 45 extra meters, in other words, 105 m total. 105 m divided by four days equals 26.25 m need to be built every day. Since one man builds 1.875 m of wall every day, to find the number of men total you need for the last four days, take 26.25÷1.875, Which equals 14 exactly. 14 is not the answer however, because it’s asking how many more men you need. Since you already have eight, you need six more to make 14

The answer is six more men
3 0
3 years ago
Other questions:
  • In the cafeteria there are 283 bananas left and 7 classes who still need to eat if each class shares the bananas equally how man
    9·1 answer
  • Emil's backpack weighs 6 3/8 pounds. He removes a book that weighs 3/4 pounds. Then he removed a book that weighs 1/2 pound. How
    7·1 answer
  • A lawnmower was purchased for rupees 1100 and rupees 50 were paid as transportation charges. It was sold at a 14% profit. Find i
    8·1 answer
  • Tomas bought a book that originally cost $25.99 on sale for 25% off. He paid 6% sales tax. To the nearest cent, how much did Tom
    13·1 answer
  • Evaluate the expression 10−5a+(18−b), where a=2 and b=11.
    14·1 answer
  • Given the equation y = 3x + 2 , what is the value of x when y = 8? A:2 B:4 C:6 D:9
    12·1 answer
  • If these two shapes are similar, what is the measure of the missing length n?
    5·1 answer
  • Nonsense will be Reported!!​
    12·2 answers
  • What is the range of this set of test scores?
    13·1 answer
  • 4x² + 24x + 20<br> common factor =
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!