The value of the a and b will be 6 and 9 feet. Every 2 inches on the scale drawing represents 1.5 feet of the original house.
<h3 /><h3>What is unit conversion?</h3>
The process of converting the unit form is known as the unit conversion. For example, in the SI unit system, mass is in kg. While in CGS, it is represented in grams.
<h2 />
The given conversion is ;
<h2 />

For 8, 12 inches, the values in feet is;


Hence, the value of the a and b will be 6 and 9 feet.
To learn more about the unit conversion, refer to the link;
brainly.com/question/4736731
#SPJ1
x=31,y=−61
Put the equations in standard form and then use matrices to solve the system of equations.
5x+4y=1,3x−6y=2
Write the equations in matrix form.
(534−6)(xy)=(12)
Left multiply the equation by the inverse matrix of (534−6).
inverse((534−6))(534−6)(xy)=inverse((534−6))(12)
The product of a matrix and its inverse is the identity matrix.
(1001)(xy)=inverse((534−6))(12)
Multiply the matrices on the left hand side of the equal sign.
(xy)=inverse((534−6))(12)
For the 2×2 matrix (acbd), the inverse matrix is (ad−bcdad−bc−cad−bc−bad−bca), so the matrix equation can be rewritten as a matrix multiplication problem.
(xy)=(5(−6)−4×3−6−5(−6)−4×33−5(−6)−4×345(−6)−4×35)(12)
Do the arithmetic.
(xy)=(71141212−425)(12)
Multiply the matrices.
(xy)=(71+212×2141−425×2)
Do the arithmetic.
(xy)=(31−61)
Extract the matrix elements x and y.
x=31,y=−61
Answer:
a) P(x<5)=0.
b) E(X)=15.
c) P(8<x<13)=0.3.
d) P=0.216.
e) P=1.
Step-by-step explanation:
We have the function:

a) We calculate the probability that you need less than 5 minutes to get up:

Therefore, the probability is P(x<5)=0.
b) It takes us between 10 and 20 minutes to get up. The expected value is to get up in 15 minutes.
E(X)=15.
c) We calculate the probability that you will need between 8 and 13 minutes:
![P(8\leq x\leq 13)=P(10\leqx\leq 13)\\\\P(8\leq x\leq 13)=\int_{10}^{13} f(x)\, dx\\\\P(8\leq x\leq 13)=\int_{10}^{13} \frac{1}{10} \, dx\\\\P(8\leq x\leq 13)=\frac{1}{10} \cdot [x]_{10}^{13}\\\\P(8\leq x\leq 13)=\frac{1}{10} \cdot (13-10)\\\\P(8\leq x\leq 13)=\frac{3}{10}\\\\P(8\leq x\leq 13)=0.3](https://tex.z-dn.net/?f=P%288%5Cleq%20x%5Cleq%2013%29%3DP%2810%5Cleqx%5Cleq%2013%29%5C%5C%5C%5CP%288%5Cleq%20x%5Cleq%2013%29%3D%5Cint_%7B10%7D%5E%7B13%7D%20f%28x%29%5C%2C%20dx%5C%5C%5C%5CP%288%5Cleq%20x%5Cleq%2013%29%3D%5Cint_%7B10%7D%5E%7B13%7D%20%5Cfrac%7B1%7D%7B10%7D%20%5C%2C%20dx%5C%5C%5C%5CP%288%5Cleq%20x%5Cleq%2013%29%3D%5Cfrac%7B1%7D%7B10%7D%20%5Ccdot%20%5Bx%5D_%7B10%7D%5E%7B13%7D%5C%5C%5C%5CP%288%5Cleq%20x%5Cleq%2013%29%3D%5Cfrac%7B1%7D%7B10%7D%20%5Ccdot%20%2813-10%29%5C%5C%5C%5CP%288%5Cleq%20x%5Cleq%2013%29%3D%5Cfrac%7B3%7D%7B10%7D%5C%5C%5C%5CP%288%5Cleq%20x%5Cleq%2013%29%3D0.3)
Therefore, the probability is P(8<x<13)=0.3.
d) We calculate the probability that you will be late to each of the 9:30am classes next week:
![P(x>14)=\int_{14}^{20} f(x)\, dx\\\\P(x>14)=\int_{14}^{20} \frac{1}{10} \, dx\\\\P(x>14)=\frac{1}{10} [x]_{14}^{20}\\\\P(x>14)=\frac{6}{10}\\\\P(x>14)=0.6](https://tex.z-dn.net/?f=P%28x%3E14%29%3D%5Cint_%7B14%7D%5E%7B20%7D%20f%28x%29%5C%2C%20dx%5C%5C%5C%5CP%28x%3E14%29%3D%5Cint_%7B14%7D%5E%7B20%7D%20%5Cfrac%7B1%7D%7B10%7D%20%5C%2C%20dx%5C%5C%5C%5CP%28x%3E14%29%3D%5Cfrac%7B1%7D%7B10%7D%20%5Bx%5D_%7B14%7D%5E%7B20%7D%5C%5C%5C%5CP%28x%3E14%29%3D%5Cfrac%7B6%7D%7B10%7D%5C%5C%5C%5CP%28x%3E14%29%3D0.6)
You have 9:30am classes three times a week. So, we get:

Therefore, the probability is P=0.216.
e) We calculate the probability that you are late to at least one 9am class next week:
![P(x>9.5)=\int_{10}^{20} f(x)\, dx\\\\P(x>9.5)=\int_{10}^{20} \frac{1}{10} \, dx\\\\P(x>9.5)=\frac{1}{10} [x]_{10}^{20}\\\\P(x>9.5)=1](https://tex.z-dn.net/?f=P%28x%3E9.5%29%3D%5Cint_%7B10%7D%5E%7B20%7D%20f%28x%29%5C%2C%20dx%5C%5C%5C%5CP%28x%3E9.5%29%3D%5Cint_%7B10%7D%5E%7B20%7D%20%5Cfrac%7B1%7D%7B10%7D%20%5C%2C%20dx%5C%5C%5C%5CP%28x%3E9.5%29%3D%5Cfrac%7B1%7D%7B10%7D%20%5Bx%5D_%7B10%7D%5E%7B20%7D%5C%5C%5C%5CP%28x%3E9.5%29%3D1)
Therefore, the probability is P=1.
Each just has different amounts of 0s
Let’s write it simply, that helps us solve it easier.
6x^2+4x+8
Now, insert 7 in place of x.
6(7)^2+4(7)+8
Now, multiply.
42^2+28+8
Solve for exponents.
1,764+28+8
Add.
1,792+8
1,800
Hope this helps!