The minimal completion time for the activities is the shortest possible time for all the activities to be finished. In doing this, we look at the path that would require the greatest amount of time. At the START node, we choose the path that would take the longest which is 7 days leading to ACTIVITY D. Next, we choose the path leading to ACTIVITY B which takes 5 days. Then, we move to ACTIVITY C taking 5 days and finally, reach the END which would take 6 days. So, the minimal completion time is:
7 + 5 + 5 + 6 = 23 days
Answer:
Step-by-step explanation:
n²+2n+1 = (n+1)(n+1)
n²-8n-9 = (n+1)(n-9)
the least common denominator for these two rational expressions is :
(n+1)(n-9)
Answer:
I should use at least 304 students
Step-by-step explanation:
Margin error (E) = t × sd/√n
E = 40
sd = 300
confidence level (C) = 98% = 0.98
significance level = 1 - C = 1 - 0.98 = 0.02 = 2%
t-value corresponding to 2% significance level and infinity degree of freedom is 2.326
n = (t×sd/E)^2 = (2.326×300/40)^2 = 17.445^2 = 304 (to the nearest integer)
Answer:
3 more than
Step-by-step explanation:
Hope this correct and Your welcome
Answer:
1,448.4 mm.
Step-by-step explanation:
Volume is the length, width, and height multiplied together.
14.2 mm x 12 mm x 8.5 mm = 1,448.4 mm^2.