Answer:
Assuming an upstander is someone that opposes cyberbullying:
(1) Call them out
(2) Report the behavior to proper moderation authority
(3) Tell the person to block messages from the cyberbully
I don't really know what else you want from this.
Cheers.
Answer:
D. Computer assisted coding
Explanation:
A Computer Assisted Coding System is a software that scans medical documents and generates codes that are appropriately designed for key phrases and terminology in the document. This system is used to enhance productivity, accuracy and efficiency. It can identify when there is a diagnosis of a certain ailment or just used as it is in the family history. It has several advantages over manual coding and even helps identify mistakes made by manual coding.
Answer:
int costOfBusRental;
int maxBusRiders;
int costPerRider;
costPerRider = costOfBusRental/maxBusRiders;
Explanation:
The costPerRider is the total cost of renting the bus (costofBusRental) divided by all the bus users (maxBusRiders). So we declare the three variables to be of type int as required by the question.
Answer:
algorithms for finding the area
Explanation:
you need algorithms to find out any computer input information.
Answer:
Project life cycle is the time taken to complete a project, from start to finish.
The three project life cycles model include the following:
- Predictive
- Iterative and Incremental
- Adaptive
Explanation:
Predictive project life cycles model: In this stage, the three major constraints of the project which are the scope, time and cost are analyzed ahead of time and this analysis is well detailed and the detailed scope of the project is done right from the start of the project.
Iterative and Incremental life cycles model: In this iterative and incremental model, the project is again split into stages that can be sequential or overlapping and at the first iteration of the project, the scope is determined ahead of time.
Adaptive life cycles model: Also in this stage, the project is split up into phases but because these phases are more rapid and ever changing unlike the other models, the processes within the scope can work in parallel.
Similarities
- They make use of high level planning.
- They are sequential and overlapping.
- They make use of high level scope.
Differences
- The predictive life cycle model makes use of a detailed scope at the beginning of a project while the other models make use of detailed scope only for each phase.
- In predictive life cycle model, the product is well understood, in other models, the projects are complex and not easily understood.
- There is periodic customer involvement in predictive and interative life cycle model while the customer involvement in the adaptive model, the customer model is continuous.