1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
BlackZzzverrR [31]
3 years ago
6

Pls help me with this question i’ll be giving a brainliest to the person with the correct answer

Mathematics
1 answer:
Aleksandr [31]3 years ago
5 0

Answer:

i believe it’s the second and third one, not too sure about the first

Step-by-step explanation:

You might be interested in
Which function represents the graph of f(s)=-4[x] after it is translated 3 units down?
MaRussiya [10]
I'm not sure but I think, f(s)=-4[x]-3
8 0
3 years ago
An angle's initial ray points in the 3-o'clock direction and its terminal ray rotates CCW. Let θ represent the angle's varying m
Alexxandr [17]

Answer:

0.546 , -4.71

Step-by-step explanation:

Given:

An angle's initial ray points in the 3-o'clock direction and its terminal ray rotates counter -clock wise.

Here, Slope = tan\theta

If θ = 0.5

Then, Slope = tan(θ) = tan(0.5) = 0.546

If θ = 1.78

Then, Slope = tan(θ) = tan(1.78) = - 4.71

The expression (in terms of θ) that represents the varying slope of the terminal ray.

Slope = m = tanθ, where θ is the varying angle

7 0
3 years ago
If point p and q contened in a plane then PQ is entirely contained in that plane?
anyanavicka [17]
Please elaborate on this so that I can help you.
6 0
3 years ago
A construction crew is lengthening a road. Let L be the total length of the road (in miles). Let D be the number of days the cre
djverab [1.8K]

Answer:

Set of Values for Domain = {1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80}

Set of Values for Range = {402, 404, 406, 408, 410, 412, 414, 416, 418, 420, 422, 424, 426, 428, 430, 432, 434, 436, 438, 440, 442, 444, 446, 448, 450, 452, 454, 456, 458, 460, 462, 464, 466, 468, 470, 472, 474, 476, 478, 480, 482, 484, 486, 488, 490, 492, 494, 496, 498, 500, 502, 504, 506, 508, 510, 512, 514, 516, 518, 520, 522, 524, 526, 528, 530, 532, 534, 536, 538, 540 542, 544, 546, 548 550, 552, 554, 556, 558, 560}.

Step-by-step explanation:

Solution...

Assume that there is a link for the road between your house and the market the road maintenance team is meant to repair the road.

now the system of work is that the length of the road they will work upon is equal to 2 times the amount of days + 400.

This is to say that originally there is 400 miles of the road, and once they work in a day they add 2 more miles to the original 400. if they work in 2 days they add 4 more miles to the original 400. If they work in 3 days they add 6 more miles to the original 400.

So L = 2(D) + 400.

Answer 1.

description of the values in both the domain and range of a function.

the domain is the set of all values for which the function is defined.

this means that the domain is all numbers between 0 to 80.

Why do we begin from 0, because when you put 0 into the equation you have, L = 2(0) + 400, and this is equal to 2 x 0 + 400 or 400 + 0 (since all numbers multiplied by 0 gives 0).

Why is 80 the maximum, this is because they work for at most 80 days.

So the domain is

D = {1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80}

And the range is the set of all values that L (which is the function) takes, to get this you have to calculate the days from day 0 to day 80.

The range for the function is...

L = {402, 404, 406, 408, 410, 412, 414, 416, 418, 420, 422, 424, 426, 428, 430, 432, 434, 436, 438, 440, 442, 444, 446, 448, 450, 452, 454, 456, 458, 460, 462, 464, 466, 468, 470, 472, 474, 476, 478, 480, 482, 484, 486, 488, 490, 492, 494, 496, 498, 500, 502, 504, 506, 508, 510, 512, 514, 516, 518, 520, 522, 524, 526, 528, 530, 532, 534, 536, 538, 540 542, 544, 546, 548 550, 552, 554, 556, 558, 560}.

So how did we get all these. Using the figures registered as D to get the L.

Before solving, remember that, (HD is H•D or H × D,

2D is 2•D or 2 × D,

29F is 29•F or 29 × F... When numbers are used to multiply letters which stand as a varying value like X, Y, D etc, then they are written as 2x or 2•x or 2(x). They all mean multiply 2 by x)

So, i.e.

L = 2(D) + 400.

When it's day 1, D is 1

L = 2(1) + 400 which equals 2 + 400 = 402. So for 1 day, the crew has worked 402 miles.

On Day 2, D is 2

L = 2(2) + 400 which equals 4 + 400 = 404. So for 2 days, the crew has worked 404 miles.

On Day 3, D is 3

L = 2(3) + 400 which equals 6 + 400 = 406. So for 3 days, the crew has worked 406 miles.

On Day 4, D is 4

L = 2(4) + 400 which equals 8 + 400 = 408. So for 4 days, the crew has worked 408 miles.

On Day 5, D is 5

L = 2(5) + 400 which equals 10 + 400 = 410. So for 5 days, the crew has worked 410 miles.

On Day 6, D is 6

L = 2(6) + 400 which equals 12 + 400 = 412. So for 6 days, the crew has worked 412 miles.

...

...

...

For 7 days, the crew has worked 414 miles.

For 8 days, the crew has worked 416 miles.

For 9 days, the crew has worked 418 miles.

For 10 days, the crew has worked 420 miles.

For 20 days, the crew has worked 440 miles.

For 30 days, the crew has worked 460 miles.

For 40 days, the crew has worked 480 miles.

For 50 days, the crew has worked 500 miles.

For 60 days, the crew has worked 520 miles.

For 70 days, the crew has worked 540 miles.

For 75 days, the crew has worked 550 miles.

...

...

...

On Day 79, D is 79

L = 2(79) + 400 which equals 158 + 400 = 558. So for 79 days, the crew has worked 558 miles..

On Day 80, D is 80

L = 2(80) + 400 which equals 160 + 400 = 560. So for 80 days, the crew has worked 560 miles.

That is how the domain and range is determined.

6 0
3 years ago
Which is the equation of a parabola with vertex (0, 0), that opens to the left and
andrezito [222]

Answer:

Step-by-step explanation:

I'm going to guess that the square  exponents are on the top y's   only?   then answer b) looks good

8 0
3 years ago
Read 2 more answers
Other questions:
  • A. A batch of 30 parts contains five defects. If two parts are drawn randomly one at a time without replacement, what is the pro
    12·1 answer
  • Some one please help !!! How do I solve -1<-x/3<1
    8·1 answer
  • 29 thousands = blank
    8·2 answers
  • Robin used one fourth of a pound of butter to make a cake. Before she started she seven eighths of a pound of butter. How much b
    10·1 answer
  • 2.486 L is equal to: <br> 0.2486 mL <br> 24.86 mL <br> 248.6 mL <br> 2,486 mL
    11·2 answers
  • The table shows the values of a function f(x).
    5·1 answer
  • A coordinate grid is shown below. 12 11 -1 0 -1 -2 Part A: Which point represents the origin? (2 points) Part B: Starting from t
    7·1 answer
  • Which type of transformation is shown here?
    6·1 answer
  • 2.
    15·2 answers
  • What is X equal to? It’s not 90 degrees
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!