1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Nadya [2.5K]
3 years ago
6

How can a Line Plot help you find an average with data given in Fractions?

Mathematics
2 answers:
umka2103 [35]3 years ago
7 0

Answer:

I did not understand its confusing

Hoochie [10]3 years ago
6 0

Answer: Since it tells you where everyone is and where the average is, it's helpful.

You might be interested in
Need help with this trigonometry word problem
kobusy [5.1K]

Answer:

86.6

Step-by-step explanation:



Here, AB represents height of the building, BC represents distance of the building from the point of observation.

In the right triangle ABC, the side which is opposite to the angle 60 degree is known as opposite side (AB), the side which is opposite to 90 degree is called hypotenuse side (AC) and the remaining side is called adjacent side (BC).

Now we need to find the length of the side AB.

tanθ  =  Opposite side/Adjacent side

tan 60°  =  AB/BC

√3  =  AB/50

√3 x 50  =  AB

AB  =  50√3

Approximate value of √3 is 1.732

AB  =  50 (1.732)

     AB  =  86.6 m

So, the height of the building is 86.6 m

4 0
3 years ago
Read 2 more answers
I need it right now please help me!
tankabanditka [31]

I can't directly tell you the answer, but I can help you for how to do it.

So every single time you want to find the rate of change (slope) label 2 points with x1, y1, x2 and y2. We can use the point-slope form to sind the slope:

y1-y2/x1-x2

And we just need to plug in the point to get the Y intercept.

When the x is 0, the y value will be the y-intercept.

The slope intercept form is: y=Mx+B. M stands for slope and B stand for y-intercept. Just plug the slope and y-intercept in and get the answer.

6 0
3 years ago
Read 2 more answers
30p questions hurry need your help pleaseeee!!
Ber [7]

Yes she can find the average colour by adding up all the amount of colors by how many colors there are.

6 0
3 years ago
Read 2 more answers
Suppose a certain manufacturing company produces connecting rods for 4- and 6-cylinder automobile engines using the same product
gregori [183]

Answer:

Generally the constraint that sets next week are shown below

Generally the constrain that sets next week maximum production of connecting rod for 4 cylinder  to  W_4 or  0 is  

     x_4 \le W_4 *  s_4

    x_4 \le 5000 *  s_4

Generally the constrain that sets next week maximum production of connecting rod for 6 cylinder  to  W_6 or  0  is  

     x_6 \le W_6 *  s_6

     x_6 \le 8,000 *  s_6

Generally the constrain that limits the production of connecting rods  for both 4 cylinder and 6 cylinders  is

     x_4 \le W_4 *  s_6

=>   x_4 \le 5000 *  s_6

     x_4 \le W_6 *  s_4

=>    x_4 \le 8000 *  s_4

     s_4 + s_6 = 1

The minimum cost of production for next week is  

   U  =  M_4 *  x_4 + M_6 * x_6 + C_4 * s_4 + C_6 * s_6

=>  U  =  13x_4 + 16x_6 + 2000 s_4 + 3500 s_6

Step-by-step explanation:

The cost for the four cylinder production line is  C_4 =  \$2,100

The cost for the six cylinder production line is  C_6 = \$3,500

The manufacturing cost for each four cylinder is  M_4= \$13

 The manufacturing cost for each six cylinder is M_6= \$16

  The weekly production capacity for 4 cylinder connecting rod is W_4 = 5,000

   The weekly production capacity for 6 cylinder connecting rod is W_6 = 8,000

Generally the constraint that sets next week are shown below

Generally the constrain that sets next week maximum production of connecting rod for 4 cylinder  to  W_4 or  0 is  

     x_4 \le W_4 *  s_4

    x_4 \le 5000 *  s_4

Generally the constrain that sets next week maximum production of connecting rod for 6 cylinder  to  W_6 or  0  is  

     x_6 \le W_6 *  s_6

     x_6 \le 8,000 *  s_6

Generally the constrain that limits the production of connecting rods  for both 4 cylinder and 6 cylinders  is

     x_4 \le W_4 *  s_6

=>   x_4 \le 5000 *  s_6

     x_4 \le W_6 *  s_4

=>    x_4 \le 8000 *  s_4

     s_4 + s_6 = 1

The minimum cost of production for next week is  

   U  =  M_4 *  x_4 + M_6 * x_6 + C_4 * s_4 + C_6 * s_6

=>  U  =  13x_4 + 16x_6 + 2000 s_4 + 3500 s_6

3 0
4 years ago
NEED ASAP!! WILL MARK AS BRAINLIEST
Serga [27]
Use distance formula, line segment Uv is 5, vw is 6, and uw is square root of 61, add line segments up to get perimeter
5 0
2 years ago
Read 2 more answers
Other questions:
  • How do you divide that.
    15·1 answer
  • Please help me :) i would appreciate it a lot
    13·1 answer
  • A bag contains 5 blue marbles, 6 red marbles, and 7 green marbles. two random marbles are drawn, one at a time without replaceme
    11·1 answer
  • Use an inequality to describe the interval of real numbers <br><br>(-3,8]
    15·1 answer
  • I am making 50 cupcakes i need to measure flour which unit of measure would I use to measure the flour
    11·2 answers
  • The shopping center in Montgomeryville has 23,619 square feet the shopping center in harleyville has 6,522 square feet. What sta
    15·1 answer
  • sad story not my pics got from the internet on gram this is bopy he is about 6 or 7 his brother is using him for clout and makin
    14·1 answer
  • I need helppppp with this please
    5·1 answer
  • A person is flying a kite to the full extend of its 200-ft-string.
    9·1 answer
  • Fully simplify −10x3y2(9x)
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!