Answer:
12.5 hours
Step-by-step explanation:
15/6 is 2.5. 2.5 is how many hours per worker. 5 times 2.5 is 12.5 hours
$88.50 you just add btw.just letting u know
Answer:
n = 12
Step-by-step explanation:
(n-8)x 7 = 28
n-8 = 4
n = 12
Answer:
x = 5/39
, y = 539/39
Step-by-step explanation:
Solve the following system:
{y - 2.5 x = 13.5
12.25 x - y = -12.25
In the first equation, look to solve for y:
{y - 2.5 x = 13.5
12.25 x - y = -12.25
y - 2.5 x = y - (5 x)/2 and 13.5 = 27/2:
y - (5 x)/2 = 27/2
Add (5 x)/2 to both sides:
{y = 1/2 (5 x + 27)
12.25 x - y = -12.25
Substitute y = 1/2 (5 x + 27) into the second equation:
{y = 1/2 (5 x + 27)
1/2 (-5 x - 27) + 12.25 x = -12.25
(-5 x - 27)/2 + 12.25 x = 12.25 x + (-(5 x)/2 - 27/2) = 9.75 x - 27/2:
{y = 1/2 (5 x + 27)
9.75 x - 27/2 = -12.25
In the second equation, look to solve for x:
{y = 1/2 (5 x + 27)
9.75 x - 27/2 = -12.25
9.75 x - 27/2 = (39 x)/4 - 27/2 and -12.25 = -49/4:
(39 x)/4 - 27/2 = -49/4
Add 27/2 to both sides:
{y = 1/2 (5 x + 27)
(39 x)/4 = 5/4
Multiply both sides by 4/39:
{y = 1/2 (5 x + 27)
x = 5/39
Substitute x = 5/39 into the first equation:
{y = 539/39
x = 5/39
Collect results in alphabetical order:
Answer: {x = 5/39
, y = 539/39
It states your "X" will be zero when solving for "Y".
So when solving for "Y" your equation would be;
0+y=4
Then you solve. Y=4
Then you do the same with the "X":
X+0=4. Then you solve. X=4
It would end up being (4(x),4(y) )
Then do the same for the next problem.