Answer:
distance = 585600 m
Step-by-step explanation:
change 2 hours 20 minutes to seconds
2 hrs * 60 minutes/1hr * 60 sec/min = 7200 sec
20 minutes * 60 sec/min = 120 sec
2 hr 20 min = 7320 seconds
distance = rate * time
distance = 80 m/s * 7320 s = 585600 m
D is not in correct scientific notation. To be correct, the answer would be 5.0 x 10^2
If this helped you, please list me as brainliest!
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
9514 1404 393
Answer:
132°
Step-by-step explanation:
Name the vertex of each angle the same as the angle letter. Name the intersection of the "horizontal" and "vertical lines" point Q.
Angle ZXQ is vertical to ∠x, so is the same measure.
Angle YQX is the value that makes the sum of angles in triangle XYQ be 180°. That is ...
∠YQX = 180° -51° -57° = 72°
This is also the measure of its vertical angle in the other triangle. Angle z is the sum of that vertical angle and 60°, so we have ...
∠z = 72° +60°
∠z = 132°
_____
<em>Additional comment</em>
The relations we used are ...
- vertical angles are congruent
- sum of angles in a triangle is 180°
- an exterior angle is equal to the sum of the remote interior angles