Answer
The slope is 2
Step-by-step explanation:
<u>Answer</u>
9 Banners.
<u>Explanation</u>
If to make 1 banner we need 4/3 sections, then to get the number of banner that can be made from 12 sections, we proceed as follows.
12 ÷ 4/3 = 12 × 3/4
= (12 × 3) ÷ 4
= 36/4
= 9 Banners.
Answer:
The WIP limit is 0.50 days.
Step-by-step explanation:
The Computation of WIP limits:
to begin with, it is required to compute the process and procedure efficiency which will be computed as follows:
Value Added Time = 12 days (arriving time)
Non-Value-Added Time = 12 days (departure time)
Efficiency = Value Added / (Value Added + Non-Value Added)
= 12 / (12+12)
= 12 / 24
= 0.50 or 50%
the most obligatory throughput time will be 0.25 days to realize the profits
WIP limit = Throughput time / Efficiency
= 0.25 / 50%
= 0.50 days.
The WIP limit is 0.50 days.
Answer:
10
Step-by-step explanation:
just add
2 × 4 = 8
1/3 × 4= 1 1/3
Total = 9 1/3 cups of flour