1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Whitepunk [10]
3 years ago
7

Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir

ectly benefited from this project? identify any three sectors and write them​
Social Studies
1 answer:
sergejj [24]3 years ago
6 0

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

You might be interested in
How have theory, debate, and compromise influenced the u.s. constitutional system?
stiks02 [169]

Changes to how states/government hold accountability.

This is how theory, debate, and compromise influenced the u.s. constitutional system.

A government is a system or group of people that governs an organized community (usually a state). In the broader associative definition, government usually consists of legislative, executive, and judicial branches.

Government is defined as the exercise of control or power over a group of people. An example of a government is the UK Parliament. (uncountable) Management or control of a system. In criminal cases, the public prosecutor's office is sometimes called the government.

Government is the state or community system of government. A system of social control, the right to legislate under it, and the right to enforce it belong to specific groups in society.

Learn more about government  here:brainly.com/question/1078669
#SPJ4

4 0
1 year ago
Which of the following events during the 1600s and 1700s led to the development of slavery in the caribbean?
Liula [17]

French, English, and dutch traders joined Spanish traders in the west indies.

3 0
3 years ago
Brainliest if correct OK History Final Assessment
Bumek [7]

Answer:

American farmers, who gained millions of acres of land for settlement

Explanation:

3 0
2 years ago
[Earth science]
Ber [7]

the actual answer would be (d) arthropods

7 0
3 years ago
Read 2 more answers
Hammurabi's law code and the Law of Moses were identical in what they said although they were written by different people. User:
Mazyrski [523]
The statement above is false
Hammurabis law and moses law are not identical.

In code of Hammurabi, human have a lower value than law of Moses.

For example, according to code of Hammurabi, if man's house collapse and killed his child, the child of that house's builder should be exceuted. Meanwhile , the law of Moses tend to value human lives more than codex Hammurabi.
7 0
3 years ago
Other questions:
  • The ranas copied the divide and rule policy of East India Company was it true justify your answer​
    13·1 answer
  • Which of the following characteristics is not shared by nonprofit organizations? Group of answer choices A) Receive funding from
    15·1 answer
  • Which phrase corresponds most closely to adler's concept of a "fictional finalism"?
    10·1 answer
  • The constitutional age requirement to be eligible to run for the house of representatives is ___ years of age, and for the senat
    6·1 answer
  • Children have been assigned to a soccer team based on age. A child's ability in soccer is determined based on team placement. In
    12·1 answer
  • How did the Crusades help one class of people to become wealthy?
    13·1 answer
  • Can science teach us everything? ​
    14·1 answer
  • 1. A constitution
    12·1 answer
  • Statement best completes the diagram cause invention of air travel affect ?
    8·1 answer
  • What are the three required elements on a derivatively classified document?
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!