1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Whitepunk [10]
3 years ago
7

Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir

ectly benefited from this project? identify any three sectors and write them​
Social Studies
1 answer:
sergejj [24]3 years ago
6 0

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

You might be interested in
Where did the united states send troops after japan's invasion of indochina
Aleonysh [2.5K]
I believe it's "The Philippines"
3 0
3 years ago
Read 2 more answers
The stage of corporate capitalism that is dominated by large firms run by individual entrepreneurs or their family members and p
valina [46]

Answer:

Family Capitalism

Explanation:

In family capitalism, large business are controlled by family members and passed down to descendants. Examples are; Continental AG  owned by Schaeffler family, LG Corporation owned by Koo and Huh families, Reliance Industries  owned Ambani family and Walmart amongst others.

8 0
4 years ago
How do you convert the U.S. profits into yen
romanna [79]
If you multiply 536456 and 98.676, the answer is 52935332.256

7 0
3 years ago
Read 2 more answers
Charles I of England was tried for treason because he _________________.
nasty-shy [4]
Charles<span> believed in the divine right of kings and thought </span>he<span> could govern according to his own conscience. ... </span>Charles<span> was </span>tried<span>, </span>convicted, and executed for high treason<span> in January 1649. The monarchy was abolished and a republic called the Commonwealth of </span>England<span> was declared.</span>
5 0
3 years ago
Read 2 more answers
even though exploitation is there in unorganized sector , majority of labours are working in unorganized sectors in india . Give
Semenov [28]
<span>Majority of laborers are still working in unorganized sectors e</span><span>ven though there is exploitation because firstly, they need money. Poverty is prevalent in India, that they will do everything just to earn even though their rights are violated. Secondly, because everyone is benefiting from it, no one is reporting or making a move to oust the sectors.</span>
5 0
3 years ago
Other questions:
  • If you wanted to teach your pet parakeet to give you a kiss on the cheek, which technique would be most effective?
    9·1 answer
  • At the turn of the twentieth century, American industry was producing more goods than the country could consume, what was seen a
    15·1 answer
  • The scores of students at his school have been poor in the past and Mr. Henderson is under pressure from the principal to raise
    12·1 answer
  • PLS HELP ASAP
    10·1 answer
  • 8. 10x - 5y = 25 what is the answer​
    5·1 answer
  • Students with _____ endorse such statements as "I know that I will be able to learn the material in this class" and "I expect to
    13·1 answer
  • While in treatment for panic disorder, Leroy is asked to engage in behaviors that activate the sympathetic nervous system. In ot
    8·1 answer
  • First championed by Franz Boas to challenge the attitude that Western culture was inherently superior to others, which important
    14·1 answer
  • Assume Amy’s wants to do the greatest good for the greatest number of people. Based on this, which approach to resolving ethical
    11·1 answer
  • Price discrimination occurs when people are charged_
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!