Read the following scenario:

Computers and Technology
2 answers:
skelet666 [1.2K]3 years ago
8 0

Answer:

The director would construct a water set and use special effects to mimic the elements of a tsunami.

Explanation:

Edg2021

DochEvi [55]3 years ago
3 0

Answer:

option d

Explanation:

Hope it helps mark me brainliest :)

You might be interested in
A(n) ____cookie is created by an ad on a website, where the ad is owned and managed by a
mart [117]

Answer:

Third-party cookies

Explanation:

4 0
3 years ago
Debbie would like to create a file that she can use as a starting point to create other files for her English class. What should
Citrus2011 [14]

Answer:

c. a template.

Explanation:

She should first create a Template so that she can use it as a starting point to create other files.

A template is file created with a blueprint with  a format that can be used for a group of documents.For example:- there are different templates present of the resume.

Hence the answer to this question is template.

4 0
4 years ago
You are in charge of a datacenter that handles web requests. Each incoming request first goes to a processor that assigns it to
Marat540 [252]

Answer:

We need 201 Web servers to increase our through put to 7.2 million request per hour.

Explanation:

Given that all server are working in parallel and each server takes 100 μs for each request to process and assign it to a server. Total time taken during assigning process will be

1 process=10^{-6}\\ 7.2 mil process=7,200,000 * 10^{-6}\\

Time taken for 7.2 mil request to process =7.2 sec

Now for our server to handle request, time taken for server to handle a request is 100.1ms and server can handle 35964 request per hour approximately.

1 server= 35964 request/hour

Number of server per request

1 server handles35964  request / hour.From this we can find time taken for 7.2mil request/hour

For 7.2mil request

X=7200000* number of server per request per hourX=200.2 ~ 200 servers

5 0
4 years ago
Briefly discuss the aesthetics and ergonomics of a hydraulic jack. First explain what these
ehidna [41]

Answer:

For this model, aesthetics is defined as a measure of how attractive a product appears, and ergonomics is how well a product feels when used/held. ... Two important types of defects, part flash and crush, will be used to define ergonomic and aesthetic PA's, respectively.

5 0
3 years ago
Before starting your presentation, you should ________.
a_sh-v [17]

The answer would be

E. All of the above

6 0
4 years ago
Read 2 more answers
Other questions:
  • A telephone-repair technician uses a meter to measure voltage on a phone line. This meter is an example of _____. hardware softw
    10·2 answers
  • Describe the three criteria you should use to determine if an online media source should be included in your paper or presentati
    12·2 answers
  • Write code that inserts useritems into the output string stream itemsoss until the user enters "exit". each item should be follo
    15·1 answer
  • How is an orthographic drawing similar or different from an isometric drawing
    12·1 answer
  • What are the factors affecting the purchasing decision for dbms software?
    7·2 answers
  • Jess and Ann have decided to exchange messages using the Caesar cipher. If the predetermined key is seven places to the left, th
    10·1 answer
  • What is modularity? Help asap
    9·1 answer
  • Heeeeeeeeeeeeeeeeeeelp plz
    11·1 answer
  • 48. Which of the following can be used in the name of a variable?
    8·1 answer
  • What is branching in Python​
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!