To find meaning and decipher relationships between symbols and information
Talking books could be a means to automatize and generalize such an audio–visual reading experience. ... RWL consists of an experimental reading situation where one reads a text while one can hear it said aloud by a pre-recorded speaker or by a text-to-speech system.
Answer:
"mmaBooks.Customers.Add(customer);" is a correct answer for the above question.
Explanation:
Missing information : The correct answer is missing in the question which is defined in the answer part.
- If a user wants to add any objects to any collection in the C# programming, then he needs to follow the "Entity_data_model_named. collection_name. ADD(object_name)" syntax. The above question also wants this type of statement.
- The option c states the same statements, but there is needs one statement to define the name of db or database models. But the option c does not hold the name of the database models. Hence it is not the correct answer.
- And the other options do not follow the syntax to add, hence others is also not a valid option.
Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.
Answer:
Zero(0)
Explanation:
<u>Global Variables
</u>
Variables which are declared outside any function. Any function can use these variables,they are automatically initialized to zero(0).They are generally declared before main() function.
Example- C program for showing global variable is 0.
#include <stdio.h>
int g; // declaring g as global variable
int main()
{
printf("%d",g); //printing global variable
return 0;
}
<u>Output</u>
0
Answer:
GOF refers to the gang of four pattern that are generally consider the basic for all the other patterns. Design pattern are basically provide the solution to the software design to resolve all problems that are associated with the development of real world applications.
GOF Design pattern implemented the parts of the re-usable object oriented software applications. The main aim of design pattern is to pass all the structural design pattern. Design pattern is the most powerful and helpful tool for the software developer and architecture.