Answer:
11. It will take about 26 minutes to install a singular tile.
12. It will take about 10 more minutes to install a light than it does to install a cable.
Step-by-step explanation:
11. Since installing 15 new tiles took a total of 390 minutes and each tile took the same amount of time, you can divide the total amount of time by the number of tiles.
390/15= 26 minutes
It will take about 26 minutes to install a single tile.
12. By looking at the chart it can be assumed that installing a light takes about 22 minutes since it is in the middle of 20 and 24 minutes. Installing a cable only takes 12 minutes.
22-12= 10 minutes
It takes about 10 minutes longer to install a light than it does a cable.
B - 7
B is the number of dollars Ben has and Cam has 7 less so you just subtract 7 from b
Cot (- 210º) = - √3 so <span>30° </span>
Answer:
percent change = 27.5 % decrease
Step-by-step explanation:
percent change = (original - new)/original
percent change = (160-116)/160
percent change = 44/160
percent change =.275
change from a decimal
percent change = 27.5 % decrease