Answer:
If 2/3 ton of gravel covers 3/4 of a driveway, you need to divide 2/3 divided by 3 to find how much is needed for 1/4 of the driveway. So first step:
1. 2/3 divided by 3 = 2/3 * 1/3. So 2/9.
2. Add 2/3 plus 2/9= 8/9 ton of gravel to cover the whole driveway.
Step-by-step explanation:
Mark me brainliest!
The best answer would be C
To estimate this we can do it like this:-
<span>
Way #1
3.4 = 3
6 = 6
3 </span>÷ 6 = <span>0.5
So, to estimate 3.4 </span>÷ 6 we round 3.4 to the nearest whole number and den divide. Den d answer is our estimated answer!
3.4 ÷ 6 = 0.5
Hope I helped ya!!
I believe the answer is C