Answer:
c = $30 + $0.75p
Step-by-step explanation:
total cost = total fixed cost + total variable cost
total fixed cost = $30
Fixed costs are costs that do not vary with output.
total variable cost = variable cost per unit x total unit
p x 0.75
Variable costs are costs that vary with production
Answer:
hi
Step-by-step explanation:
hope it helps
have a nice day
1. Find the midpoint of the given endpoints. (This is the average of the coordinates of the two endpoints.)
2. Find the slope of the given line segment. (This is the difference in y coordinates divided by the difference in corresponding x coordinates.)
3. Use the point-slope form of the equation for a line to write the equation of the line through the midpoint with a slope that is the negative reciprocal of the slope of the given segment.
y = m(x-h) +k . . . . . . . . line with slope m through point (h, k)
The answer is a. x=-6, extraneous i hope that i was of some sort of help with this problem you are welcome.