First divide the rocks per 3/4 of an hour by 3 and multiply by 4 to get the production per hour. then subtract the already moved rocks from the total job and divide the answer by 16 (the rocks moved per hour) getting the time needed to move the rest
Answer:
(-2.5,1)
Step-by-step explanation:
hope that helps
Answer:
479
Step-by-step explanation:
342=2 portions
171=1 portion
2+5=7 portions in total
171 times 7=479
hope this helps
please can i get brainliest
Answer:
1 69/145 cups
Step-by-step explanation:
We can use ratio's to solve this problem. We will put water over time
214 cups x cups
--------------- = --------------
145 hours 1 hours
Using cross products
214 *1 =145 x
Divide both sides by 125
214/145 = 145x/145
214/145 = x
145 goes into 215 1 time with 69 left over
1 69/145