Answer: The correct answer is: Focus on her next level of needs.
Explanation: According to Maslow's theory of the hierarchy of needs, human beings have their needs organized in a pyramid.
The needs that are at the bottom of the pyramid must be satisfied for the individual to start satisfying the needs that are higher up. The need for security is lower in the hierarchy than the social needs.
In this particular case<u>, Erin already satisfied her needs of security because she already secured a good-paying job, a decent apartment, and an economical car, she also feels safe in her home, therefore, she now can move on to attend the needs that follow up in the hierarchy, which are social needs.</u>
<u />
Answer: Email
Explanation:
E-commerce means electronic commerce or internet commerce, and it refers to purchase and selling of goods or services through the internet, and also transferring money to perform the transactions.
The 4 types of e-commerce presence that we have include the web sites, social media, e-mail, and offline media.
Your answer would be the Bill of Rights.
<span>Around the years 1600 to
1750 are years in which baroque music was widely composed. This was the period
in which musically instruments were being developed in new playing techniques
and established many other forms of arts, such as operas and cantatas.<span>
Johann
Sebastian Bach was born on 1685 during the baroque era, and his composistions
were mostly that of the same style music. He has composed over 300 cantatas
although not all of it has survived in the modern era.
</span></span>
George Frideric Handel was
also born the same year as Bach and his works were also influence by the
baroque era.
<span>
Ludwig van Beethoven was
born by 1770 in which the baroque era has already ended and the new era of
music has followed. </span>
Answer:
True
Explanation:
It is true that during project charter creation, there is a very general understanding of the project. Usually, the project is unclear in these stages, and people are open to modifications as the project develops. When designing a budget at this stage, it should be a preliminary budget. It is important to be flexible when dealing with such plans, as designing a project that is too strict would only cause us problems later on. It would make it unable for us to adapt, and thus would mean that our project would not be suitable to our needs.