- The rate of the hose with the large diameter is:
Answer: A). 1/9.
- What is the unknown in the problem?
Answer: C). the time it takes for the hoses working together to fill the pool
-What part of the job does the hose with the large diameter do?
Answer: B). x/9
Answer:
c
Step-by-step explanation:
A scale drawing is a reduced form in terms of dimensions of an original image / building / object
the scale drawing is usually reduced at a constant dimension
scale of the drawing = original dimensions / dimensions of the scale drawing
DEF should be three times as big as ABC
AB = 5 ; DE = 5 x 3 = 15
AC = 3 ; DF = 3x 3 = 9
BC = 4 ; EF = 4 X 3 = 12
the options that correspond to this is option c
Answer:
t=40+20w
can i get a brainiest bottom right of my answer click the crown
Answer:
The average is 125
Step-by-step explanation:
On Monday through Friday they carried 121 papers
5*121 = 605 papers
Saturday and Sunday they had 135
2*135 = 270
The total papers carried during the week was
605+270 = 875
there are 7 days in a week. To find the average, take the papers carried and divide by the number of days
875/7 = 125
The correct answer would be: 18+18i