The area under the speed curve tells you how much distance the vehicle covers.
The distance for first 30 s corresponds to the area of a rectangle with height <em>k</em> m/s and length 30 s, or
(<em>k</em> m/s) (30 s) = 30<em>k</em> m
The distance for the last 20 s corresponds to the area of triangle with height <em>k</em> m/s and length 20 s, or
1/2 (<em>k</em> m/s) (20 s) = 10<em>k</em> m
If the total distance traveled was 1.7 km = 1700 m, then
30<em>k</em> + 10<em>k</em> = 1700
40<em>k</em> = 1700
<em>k</em> = 42.5
First u add all of them and then multiple 2 numbers then theres ur answer
6
Step-by-step explanation:
Step 1:
Let Rachel scored 33 points in total
Let a be the 1 point and b be the 2 point.
a = 21 points scored by 1 point. We want to find b
Step 2:
a+b=33
b= 33-a
= 33-21
= 12
b=12 points which means 6 double points
The triangle pay $32 more for that day than it paid per day during the first period of time.
Step-by-step explanation:
The given is,
Triangle Construction pays Square Insurance $5,980
To insure a construction site for 92 days
To extend the insurance beyond the 92 days costs $97 per day
Triangle extends the insurance by 1 day
Step:1
Insurance per day from the 92 days period,

Where, Total insurance for 92 days = $ 5,980
Period = 92 days
From the values, equation becomes,

= $ 65 per day
Step:2
Insurance per day after the 92 days,
= $ 97
Amount Pay for that day than it paid per day during the first period of time,

= $32
Result:
The triangle pay $32 more for that day than it paid per day during the first period of time, if the Triangle Construction pays Square Insurance $5,980
to insure a construction site for 92 days and to extend the insurance beyond the 92 days costs $97 per day.