Answer:
pls sorry i dont know the answer can you say the answer of it any one can to me
i also needed the answer toooooooooo..............................................................
Step-by-step explanation:
Answer:
x = -5, and y = -6
Step-by-step explanation:
Suppose that we have two equations:
A = B
and
C = D
combining the equations means that we will do:
First we multiply both whole equations by constants:
k*(A = B) ---> k*A = k*B
j*(C = D) ----> j*C = j*D
And then we "add" them:
k*A + j*C = k*B + j*D
Now we have the equations:
-x - y = 11
4*x - 5*y = 10
We want to add them in a given form that one of the variables cancels, so we can solve it for the other variable.
Then we can take the first equation:
-x - y = 11
and multiply both sides by 4.
4*(-x - y = 11)
Then we get:
4*(-x - y) = 4*11
-4*x - 4*y = 44
Now we have the two equations:
-4*x - 4*y = 44
4*x - 5*y = 10
(here we can think that we multiplied the second equation by 1, then we have k = 4, and j = 1)
If we add them, we get:
(-4*x - 4*y) + (4*x - 5*y) = 10 + 44
-4*x - 4*y + 4*x - 5*y = 54
-9*y = 54
So we combined the equations and now ended with an equation that is really easy to solve for y.
y = 54/-9 = -6
Now that we know the value of y, we can simply replace it in one of the two equations to get the value of x.
-x - y = 11
-x - (-6) = 11
-x + 6 = 11
-x = 11 -6 = 5
-x = 5
x = -5
Then:
x = -5, and y = -6
P = a + b + c
P = 72
a = x
b = x + 2
c = x + 4
72 = x + x + 2 + x + 4
72 = 3x + 6
72 - 6 = 3x
66 = 3x
66/3 = x
22 = x
x + 2 = 22 + 2 = 24
x + 4 = 22 + 4 = 26
the sides of ur triangle are : 22,24,26 <==
The first, fourth and fifth ones are linear.
The second, third and sixth are all nonlinear.
You can tell this by the fact that their lead exponents are not 1.
Answer:
The bulbs should be replaced each 1436.9 hours.
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

How often should the bulbs be replaced so that no more than 1% burn out between replacement periods?
This is the first percentile of hours. So it is X when Z has a pvalue of 0.01.
So it is X when Z = -2.33.




The bulbs should be replaced each 1436.9 hours.