Answer:
D.
Step-by-step explanation:
Given
Required
Determine its equivalent
<em>From the list of given options, the correct answer is</em>
This is shown as follows;
Multiply both sides by
Open Bracket
Subtract x from both sides
Multiply both sides by -1
Reorder
<em>Hence, the correct option is D</em>
Answer:
i think its transitive
Step-by-step explanation:
Answer:
4 days
Step-by-step explanation:
We need to use the probability functions of each of the intervals to know the Probability number and then use it in the expected value.
P(x>3 cargo ships) = 1-P(x<=3)
P(x>3) = 1-P(x<=3)
P(x>3) = 1-[P(x=0)+P(x=1)+P(x=2)+P(x=3)]
P(x>3) = 1- [0.1353(1+2+2+1.33)]
P(x>3) = 1-0.856
P(x>3) = 0.1431
Als n=30, expected number is
E(x) =30*P(x>3)
E(x) = 30*0.1431
E(x) = 4.293
I expect 4.293 or 4 days per month the block being unable to hanlde all arriving ships
Answer:
The determinant of J can be found using the formula ad - bc
where
So we have
Step-by-step explanation: