Explanation:
cost
- ongoing maintenance
- initial design and construction
benefit
- protection of infrastructure
- lower insurance costs
- employment opportunities
The flood mitigation projects have initial startup costs and ongoing maintenance costs over the years. However, apart from the costs, these have additional benefits like lower insurance costs due to protected infrastructure and reduced flood damage, along with employment opportunities during building and maintenance.
Further Explanation:
Flooding usually happens when lots of rainfall occurs in relatively short time periods. These are usually enough to cause rivers to overflow their banks and also occur when storms force large volumes of water from the ocean to travel inland. Typically these occur in arid ecosystems, having low average rainfall- the water accumulates in dry regions and saturates the area. This phenomena are majorly destructive and can uproot trees, destroy bridges, buildings and other infrastructure while leading to loss of life.
Learn more about flooding and other natural disasters at brainly.com/question/1820994
#LearnWithBrainly
The four terrestrial planets, Mercury, Venus, Earth, and Mars, are all much closer together compared to the distances separating the outer planets (anything beyond mars)
Answer:
D
Explanation:
Males have testes while females have ovaries
Answer:
C.
Zebras depend on soil to grow grass, which the zebras eat.
give brainliest plz
One of the three phosphate groups on the ATP are released to form ADP leaving it with two phosphate groups. Breaking down this ATP releases energy to be used by the cell.