grin007 [14]
2 years ago
12

What is the answer to -39 - -16 equal to and what are the steps to get it?

Mathematics
2 answers:
sergejj [24]2 years ago
8 0

Answer:

-23

Step-by-step explanation:

Subtract -39 and -16 then you should get -23. Have a nice day :)

Lyrx [107]2 years ago
5 0

Answer:

-23

Step-by-step explanation:

Since 2 negatives are next to each other, you have to make it into addition.

-39+16

Now we have to subtract 39 and 16. Why? because we have we are adding 16. If you draw a number line, start from -39, and move 16 sports ahead.

39-16= 23

Now, We aren't ahead of the 0, we are still in the negative zone. Your answer is -23.

Not sure if you can make number lines on here, but I tried.

You might be interested in
A filling machine puts an average of four ounces of coffee in jars, with a standard deviation of 0.25 ounces. forty jars filled
Lunna [17]
Let's attack this problem using the z-score concept.  The sample std. dev. here is (0.25 oz)/sqrt(40), or 0.040.  Thus, the z score representing 3.9 oz. is
        3.9 - 4.0
z = -------------- = -2.5
          0.040 

In one way or another we must find the area under the std. normal curve that lies to the left of z = -2.5.  Use a table of z-scores or a calculator with built-in statistics functions.  According to my TI-83 Plus calculator, that area is

0.006.  One way of interpreting this that with so small a standard deviation, most volumes of coffee put into the jars are very close to the mean, 4 oz.
4 0
3 years ago
Use the following to answer questions 7-9:
seropon [69]

Answer:the third one .38x+2.59

Step-by-step explanation:

No amount of donuts yet so that’s why it’s x and there’s a regular fee of 2.59 so that’s why it’s the answer

7 0
3 years ago
Rectangle A’B’C’D is the image of rectangle ABCD after a diliation what is the scale factor of the diliation
PSYCHO15rus [73]
Rectangle A’B’C’D’ has a scale factor of 2 because it is two times bigger then the original rectangle ABCD after the dilation.
4 0
3 years ago
F(x)= 4x4 – 8x3 – 3x2 +7x – 2
Alenkinab [10]

Answer:

the answer is B 1/2

Step-by-step explanation:


6 0
3 years ago
Read 2 more answers
Suppose a certain manufacturing company produces connecting rods for 4- and 6-cylinder automobile engines using the same product
gregori [183]

Answer:

Generally the constraint that sets next week are shown below

Generally the constrain that sets next week maximum production of connecting rod for 4 cylinder  to  W_4 or  0 is  

     x_4 \le W_4 *  s_4

    x_4 \le 5000 *  s_4

Generally the constrain that sets next week maximum production of connecting rod for 6 cylinder  to  W_6 or  0  is  

     x_6 \le W_6 *  s_6

     x_6 \le 8,000 *  s_6

Generally the constrain that limits the production of connecting rods  for both 4 cylinder and 6 cylinders  is

     x_4 \le W_4 *  s_6

=>   x_4 \le 5000 *  s_6

     x_4 \le W_6 *  s_4

=>    x_4 \le 8000 *  s_4

     s_4 + s_6 = 1

The minimum cost of production for next week is  

   U  =  M_4 *  x_4 + M_6 * x_6 + C_4 * s_4 + C_6 * s_6

=>  U  =  13x_4 + 16x_6 + 2000 s_4 + 3500 s_6

Step-by-step explanation:

The cost for the four cylinder production line is  C_4 =  \$2,100

The cost for the six cylinder production line is  C_6 = \$3,500

The manufacturing cost for each four cylinder is  M_4= \$13

 The manufacturing cost for each six cylinder is M_6= \$16

  The weekly production capacity for 4 cylinder connecting rod is W_4 = 5,000

   The weekly production capacity for 6 cylinder connecting rod is W_6 = 8,000

Generally the constraint that sets next week are shown below

Generally the constrain that sets next week maximum production of connecting rod for 4 cylinder  to  W_4 or  0 is  

     x_4 \le W_4 *  s_4

    x_4 \le 5000 *  s_4

Generally the constrain that sets next week maximum production of connecting rod for 6 cylinder  to  W_6 or  0  is  

     x_6 \le W_6 *  s_6

     x_6 \le 8,000 *  s_6

Generally the constrain that limits the production of connecting rods  for both 4 cylinder and 6 cylinders  is

     x_4 \le W_4 *  s_6

=>   x_4 \le 5000 *  s_6

     x_4 \le W_6 *  s_4

=>    x_4 \le 8000 *  s_4

     s_4 + s_6 = 1

The minimum cost of production for next week is  

   U  =  M_4 *  x_4 + M_6 * x_6 + C_4 * s_4 + C_6 * s_6

=>  U  =  13x_4 + 16x_6 + 2000 s_4 + 3500 s_6

3 0
3 years ago
Other questions:
  • Write the expression in exponential form: logb c=a
    15·2 answers
  • Select the function that is even.
    9·1 answer
  • Betty deposits ​$300 into an account that earns 5​% interest compounded annually. Teresa deposits the same amount into an accoun
    8·1 answer
  • A set of data has a mean of 0.5 and a standard deviation of 0.01. A data point of the set has a z-score of 2.5. What does a z-sc
    7·1 answer
  • Unit rate of 5 tickets for $25 dollars
    6·2 answers
  • What is 7/12 as a decimal<br><br> Please help ASAP
    11·1 answer
  • Chris has a 3.5 feet long board of wood. he cuts out 4 pieces that are each 2/3 foot long.
    5·1 answer
  • I don't understand rational and irrational numbers
    9·1 answer
  • Solve the inequality 3x + 4 &lt; 14​
    9·1 answer
  • Tap me please thanksvjbjgsxjhex
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!