Answer:
6 men finish a piece of work in 8 days
1 men finish a piece of work in 8*6 days
4men will finish a piece of work in 48/4
days
..
which is equal to 12 days
Answer:
First Option 
Step-by-step explanation:
To graphically add two vectors a and b using the -tail and tip-method, you must draw the tail of b at the tip of the vector a. Then you must draw a line that goes from the tail of a to the tip of b. This line represents the sum of
.
In this problem, notice that the tail of the vector w is on the tip of the vector v. The line that joins the tail of v with the tip of w is u.
Therefore we can say that
.
The answer is the first option
Answer: 6x^2
Step-by-step explanation:
Answer:
1.75
Step-by-step explanation:
h(t) = -16t² + 56t
h'(t) = -32t + 56
To find time at max height equate h' to 0
0 = -32t + 56
t = 56/32 = 1.75 s
It takes 1.75 s to reach max highest point
If you need to siplify that radical, you should try to put all the numbers as product of prime factors.
922 = 2*461
2 and 461 are prime numbers. Then the transformation of the square root is √(922) = √(2*461) = (√2)(√461)
So you can use that in any expression to try to simpliy with other numbers whose prime factors include 2 and 461.