Answer: The slope of function A is greater than the slope of Function B:)
Step-by-step explanation:
Im sorry if I'm incorrect but: Both of the y intercepts would be -2. Though, I'm pretty sure Function A grows +5.
Answer:
<h3>73220±566.72</h3>
Step-by-step explanation:
The formula for calculating the confidence interval is expressed as;
CI = xbar ± z*s/√n
xbar is the sample mean = $73,220
z is the z score at 99% CI = 2.576
s is the standard deviation = $4400
n is the sample size = 400
Substitute the given values into the formula;
CI = 73,220 ± 2.576*4400/√400
CI = 73,220 ± 2.576*4400/20
CI = 73,220± (2.576*220)
CI = 73220±566.72
Hence a 99% confidence interval for μ is 73220±566.72
B is the awser to the questioning of this College Work
Answer:
1½ cords per hour
Step-by-step explanation:
A log splitter can split 6/5 cords of wood in 4/5 of an hour.
To find a unit rate, we divide the quantity of cords of wood by the time.
This gives us the complex fraction.

This is the same as

To divide two fractions, we multiply by the reciprocal of the second fraction.


This simplifies to:

The unit rate is 1.5 cords per hour