1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Brut [27]
3 years ago
11

why are there so many people on this app trying to upload links and stuff ??? i just need help on geometry.

Mathematics
1 answer:
Dennis_Churaev [7]3 years ago
8 0

Answer:

I have no idea.  It keeps happening to my questions too. Just flag them and hope they stop sometime soon. That's what I keep doing. And I suck at Geometry so I am sorry that I can't help.

Step-by-step explanation:

You might be interested in
Identify the x-intercept of the linear equation 3x+y-9=0
timama [110]

Answer:

9

Step-by-step explanation:

Get the equation into the form y = mx + c

3x + y - 9 = 0

y = -3x + 9

The y intercept is 9

4 0
3 years ago
The cost of feeding a cat during it’s lifetime
jok3333 [9.3K]

Answer:

The average lifetime cost of owning a cat ranges from $5,000 to $23,000

4 0
3 years ago
Read 2 more answers
The problem 7,291 ÷ 19 is solved below using partial quotients. Identify what partial quotient was used in each step. Then, iden
Flauer [41]

Answer:

383.7368421053

Step-by-step explanation:

I don't like Math at all

5 0
3 years ago
A building company used 24 workers to prepare a building site. The site measured 30 acres and the work was completed in 10 days.
maks197457 [2]

Answer:

30 workers are required.

Step-by-step explanation:

If the site measured 30 acres and was completed in 10 days, then it can be said that on average \frac{30}{10} = 3\frac{acres}{day} were made.

Then, 24 workers completed 3 acres / day.

Then, \frac{24.workers}{\frac{3acres}{day}} = \frac{8..Workers * days}{acre}

8 workers can complete 1 acre per day

Now to know how many workers are needed to complete 45 acres in 12 days, we multiply:

8\frac{Workers * days}{acre}*\frac{45}{12} \frac{acres}{days} = 30.workers.

Finally, 30 workers are required.

To solve this problem it was assumed that everyone worked at the same pace, which may not be true, the fact that some work at a slower or faster pace than another could alter the result, causing them to finish less or more acres by day.

6 0
3 years ago
There are 8 spiders, 5 cockroaches, 7 bees, 3 deers, 4 cows, an a pair of antlers how many legs do all the creatures amount toge
Lana71 [14]
If the pair of antlers represents a deer then 168 if not 164.
4 0
4 years ago
Read 2 more answers
Other questions:
  • Quadrilateral WXYZ is a rhombus. What is the measure of < XWZ?
    12·1 answer
  • 9: Please help. Circle C lies on the coordinate plane with its center at (2,−16).
    7·1 answer
  • Which expression confused from the area of the triangle?
    15·1 answer
  • What is the value of y?
    7·2 answers
  • Which system of equations could be used to solve for the point of intersection of the lines on the graph?
    9·1 answer
  • Pre-calc, Review the graph of f(x). Which statement describes the behavior of the function around the vertical asymptotes? (imag
    6·1 answer
  • Please tell me if I got it right
    5·1 answer
  • Welp
    15·2 answers
  • Deja has two baskets of berries. One of the baskets has 3 3 over 8 pounds of berries and the other basket has 2 7 over 8 pounds
    12·1 answer
  • 6. RULE: multiply each term by 4.
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!