Two forms of compression are lossy and lossless. State giving reasons which

Computers and Technology
1 answer:
Helen [10]2 years ago
4 0

Answer:

(i) When transmitting a draft manuscript for a book, the lossless compression technique is most suitable because after decompression, the data is rebuilt and restored in its form as it was from where it originated

(ii) When transmitting a video recording which you have made of the school play, a lossy compression technique is most suitable because the large size of video files require the increased data carrying capacity which is provided by the lossy transmission technique. The quality of the video can be reduced without affecting the message intended to be delivered

Explanation:

You might be interested in
What does CTR stand for?
ipn [44]

click through rate is the answer


6 0
3 years ago
Read 2 more answers
_ effects determine how slide elements disappear
kupik [55]
<span>Exit effects determine how slide elements disappear. </span>
6 0
3 years ago
Summarize the five stages of cultural shock
Anton [14]
1. Honeymoon stage
2. Distress and anxiety
3. Adjustment
4. Adaption
5. Re-entry shock
8 0
3 years ago
Read 2 more answers
75,15,25,5,15 what's next
Fittoniya [83]

Answer:

3

Explanation:

The sequence seems to follow a 2-step pattern.

1)Divide the first number by 5 to get the second number.

2)Add 10 to the second number to get the third number.

75/5 = 15

15 + 10 = 25

25/5 = 5

5 + 10 = 15

---> 15/5 = [3] (Answer)

3 0
2 years ago
For an activity with more than one immediate predecessor activity, which of the following is used to compute its earliest finish
laila [671]

Answer:

The correct option is A

Explanation:

In project management, earliest finish time for activity A refers to the earliest start time for succeeding activities such as B and C to start.

Assume that activities A and B comes before C, the earliest finish time for C can be arrived at by computing the earliest start-finish (critical path) of the activity with the largest EF.

That is, if two activities (A and B) come before activity C, one can estimate how long it's going to take to complete activity C if ones knows how long activity B will take (being the activity with the largest earliest finish time).

Cheers!

7 0
3 years ago
Other questions:
  • What component has the job of managing data as it flows into and out of the places it needs to go?
    11·2 answers
  • The function below takes a string argument sentence. Complete the function to return the second word of the sentence. You can as
    5·1 answer
  • Which of the following types of network can only be accessed by members within a private organization?
    5·1 answer
  • The region which satisfies all of the constraints in graphical linear programming is called the:
    8·1 answer
  • _______ is a form of crime that targets a computer system to acquire information stored on that computer system, to control the
    12·1 answer
  • A computer byte is the amount of data (measured in bits) that CPU can manipulate at one time/
    8·1 answer
  • Partes de la ventana principal de Microsoft excel 2013 con sus respectivas funciones
    14·1 answer
  • Take two String inputs of the same length and merge these by taking one character from each String (starting with the first ente
    8·2 answers
  • Que ventajas podria traer el internet a la educacion artistica? Ayuda porfa telo pido porfavor
    13·1 answer
  • What will be the result from running the following program?
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!